September 3, 2010

     

Net Metering ......

Thank you for your interest in Net Metering. Our goal is to provide you with accessible information to make your interconnection as streamlined as possible. This page provides several links for the documents you will need to get started.

Two of the documents are PRC Rule 568 and the New Mexico Interconnection Manual, which is referenced in Rule 568. The interconnection manual includes the Simplified Interconnection Application on page 24, which will be the application required for interconnecting with our distribution system for most residential customers.

Another document is the New Mexico PRC rule 570, which describes the credit you would receive should you generate more power than you consume over a given billing period. This credit would be equal to OCEC’s avoided cost, which is filed in January of every year with the PRC. OCEC’s 2010 avoided cost is $0.02982.

We would encourage all interconnections to include the installation of a meter base for a Renewable Energy Certificate (REC) meter. In addition to the benefits of the utility meter registering the net of forward and reverse consumption, the REC meter, installed on the output (AC side) of the inverter, would register everything your unit would generate. Every 1,000 kilowatt-hours generated would create one REC, which OCEC would then purchase at a defined rate, currently as listed in the REC Payment Schedule.

Some contacts that have significant experience with photovoltaic installations are as follows. The first is Grady Viramontes with Meridian Systems in Las Cruces. He can be reached at (575) 650-6062. The second is Tucker Toler with Toler & Sun Electric. He is in the Alto/Capitan area and his number is (575) 354-9802. Tucker installed the first PV system interconnected with OCEC, for Mr. Will Pote, who can be reached at (575) 354-0084.

Prior to interconnection, you should have all required paperwork and applications submitted. We will also need to inspect your installation, possibly change your meter, and have written approval from the state electrical inspector. Please contact us at (575) 682-2521 and let the operator know you are calling about Net Metering if you have any other questions or if you need more information.

 

Requires Adobe Acrobat Reader  

 

 

 

 

 

 

 


Otero County Electric Cooperative, Inc.
P.O. Box 227
Cloudcroft, NM, 88317
(575) 682-2521
Fax: (575) 682-3109

Click for Cloudcroft, New Mexico Forecast


Copyright © 2010 Otero County Electric, All rights reserved.
Hosted Courtesy of Tri-State G&T